(the result of using a private laptop until the company account was created and available).Ī final observation that I'd like some advice on: the file size of the resulting MSP file is just 1 MB, instead of the original 7 MB. The corruption has happened somewhere in the transition from an (English) MSP2010 trial version to the "current" Dutch MSP2003 installation The value was not read only as such, but modifications would not remain. The corruption madeĮach task have a non-modable duration of "0" or "0?". (I already followed the advice Mike Glen's pages, without result). All calendars are available in the new file, and I can choose them one by one by hand.Īfter some corruption crept into my project file, I found no other solution than copying all columns to MS Excel and after that, copying them back into a new MSP file. The same goes for resource calendars in the resource sheet: all values for each resource are pasted correctly, except for their default calendar. Just typing a value works, but is not what I am looking forward to. All tasks keep their level 1 assignment and do not indent upon pasting another value. I have only access to a Dutch version of MSP, being a 2003 version on top of that (company policy), which says "Overzichtsniveau". I am trying to paste values into the "WBS level" or "project structure level" column. First question, on this forum, wish me luck!
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
June 2023
Categories |